
Made by Serif
Notes: The DOER biomass report states it requires 13,000 tons of fuel to generate
one MW of power, so that a 50-
Abbreviations: tpy = tons per year; gpd = gallons per day; CO = Carbon Monoxide;
NOx = Nitrogen Oxides; HAPs = Hazardous Air Pollutants; CO2 = Carbon Dioxide; bn
= billion; mil = million; cf = cubic feet; gal = gallons; Mwhr = megawatt-
* Russell Biomass plans on including 25,000 -
** size of Tamarack plant will be between 30 and 50 MW. Few details are known about this project.
† CO2 emissions estimated based on emissions ratio of PVEC gas/diesel plant
† † Mt Tom Coal plant data from 2005; CO2 data from 2007. Plant HAPs are primarily hydrochloric acid.
COMPARISON TABLE FOR PROPOSED WESTERN MA BIOMASS PLANTS AND GAS PLANTS
|
Plant |
MW |
Fuel type |
Fuel (tpy)
|
CO (tpy)
|
NOx (tpy) |
PM (tpy)
|
HAPs (tpy) |
Water source
|
Water use (gpd) |
CO2 (tpy) |
CO2/ MWhr (lb) |
|
Russell Biomass |
50 |
wood |
510,000* |
246.16
|
194 |
84.3 |
49.1 |
Westfield River |
885,000 |
632,180 |
2,887 |
|
Pioneer Renewable Energy |
47 |
wood |
500,000 |
204.6 |
164 |
53.8
|
25 |
Greenfield waste water |
880,000 |
531,677 |
2,583 |
|
Palmer Biomass |
38 |
Wood; C&D |
73,000; 255,500 |
167 |
134 |
45.7
|
23.8 |
Springfield drinking water |
115,000 |
471,763
|
2,834 |
|
Tamarack Energy |
40** |
wood |
400,000 |
|
|
|
|
|
|
418,774 |
2,390 |
|
Pioneer Valley Energy Center |
400 |
Gas, biodiesel |
16.1 bn cf; 2.1 mil gal |
62.5 |
98.4 |
49.4 |
5.1 |
Manhan River |
2,000,000
|
1,251,819
|
715 |
|
Ludlow Stony Brook 3 |
280 |
Gas, oil |
|
|
|
|
|
|
|
914,495† |
746
|
|
Mt. Tom Coal Plant † † |
146 |
Coal |
438,000 |
448 |
1,433 |
219 |
293 |
|
|
1,166,926 |
1,973 |